I. Answer the following questions
1) Write down the steps of performing guide rail cleaning.
2) What should we do while receiving lift orders?
II. Translate the following English terms into Chinese.
1. bottom landing door entrance 2. car balustrade
3. car jamb 4. shaft dimension
5. well-ventilated 6. sill extension
7. frequency converter
8. rear diagonal reinforcement for car structure
9. CW protection screen
10. governor rope 11. counterweight filler
12. CW guide rails
13. COP / car operation panel
14. door drive
15. wall panel 16. packing list
17. villa elevator 18. freight elevator
19. panorama elevator 20. configuraton
III.Translate the following sentences into Chinese.
1) Dispose two supports in a wide well-ventilate area close to the shaft
2) Length of delivered rails must be checked and found in complicance with the shaft height.
3) Lifting points must be checked in compliance with the layout drawing.
4) Rails must be cleaned and introduced “male end up”
5) Clean the riding area by using a paintbrush or spray receptacle or cotton fibers.
6) Distribute the motor & car structure to the top floor if necessary.
7) Each pallet is marked with a label showing general information about the pallet: pallet name, contents, pallet number and total number of pallets.
8) Keep the guide rail near the bottom landing door entrance for easy installation.
9) Store the materials in an appropriate clean and dry place near to the shaft under the safety circumstance.
10) Measure the bottom guide rail from male side for required length.